This traverse of Mount Kenya combines an ascent on either the Sirimon route or the Naro Moru route on the western side to Point Lenana and a descent of the Chogoria route on the eastern side of the mountain. In total it takes five days and reaches a high point of 4985 metres over a trek of about 50 kilometres. It is not a technical climb to Lenana but there is some high altitude walking and scrambling just below the summit which is sometimes on snow and ice.